{"verdict":"pass","pageIdentity":{"url":"http://100.119.170.126:8000/particle-horizontal.html?qa=diagram-router-v23-review","visibleIdentifier":"TN SILVER · HORIZONTAL PARTICLE JOURNEY; PROCESS HANDOFF MAP · 01 의뢰 접수"},"viewports":["1440x1000 desktop whole-map state","390x844 mobile end-segment state"],"interactions":["Clicked the mobile “납품” timeline step to horizontally scroll the expanded diagram to its end segment."],"findings":[],"evidence":["Attached desktop evidence shows a direct solid route from production through 생산 후가공·검품 to 최종 확인·납품.","Attached desktop evidence shows the optional dotted route passing through the visible 외부 시험 node before entering delivery, while the dotted 재작업 return occupies a separate lower track back to 본 생산.","Attached mobile evidence shows the end-segment routes remaining distinct without crossing node text or suggesting that external testing occurs after delivery.","Live screenshots: ./desktop-live.png and ./mobile-end-live.png.","Live accessibility content confirmed visible 생산 후가공·검품, 최종 확인·납품, and 외부 시험 nodes in the mobile end state."],"runtimeErrors":[],"summary":"The bounded desktop and mobile sample revealed no obvious contract violation. The direct delivery path, optional external-test path, and lower rework return remain visually distinct and correctly ordered."}